Administration
Global settings can now be changed from the list:

Business Solutions
Materials
- A button has been added for automatically filling in batches in a goods issue document.

|
It fills in the batch with the earliest expiry date that is not blocked and has stock. If the stock is not enough to cover the line, the line is split. The user can change which batch and what quantity is issued.
- More than one batch can now be chosen to issue the quantity of the line. The user can decide which batch and what quantity is issued. If some quantity is not allocated, the line is split into a following line without a batch.
- In a goods receipt document, the “…” button now lets you create a batch with only the minimum required details.

Human Resources
Personnel
- Form 19 can now be opened from personnel documents.
- When sick leave or leave is activated, the system checks whether code 630 Rest is entered in the preliminary schedule for the period of absence. The user can choose whether to cancel or confirm the rest day.
|
What's new in Build